If you don’t see your question here, we’re always available to help. Get in touch to discuss your needs, explore opportunities, or clarify how we work.
Timelines vary by site and utility interconnection requirements, but typical installations take a few weeks to a few months from approval to go-live. We handle the heavy lifting.
What information do you need for an analysis?
A recent utility bill is the starting point. If available, interval data (15-minute or hourly consumption) helps us model more precisely. A photo of your electrical panel is helpful but optional.
How do you get paid / what's the structure?
Our commercial structures are typically performance-based and/or shared-savings options, tailored to your site's profile. We'll walk through the specifics during our analysis.
Can this provide backup power?
Absolutely, but for critical loads only. We can help configure this at set up.
Is this safe to install on-site?
Yes. Our battery systems are housed in outdoor, weatherized, fire-safe enclosures with built-in safety systems. We use certified equipment and follow all applicable codes and standards.
Does Cellera work with our utility?
Yes. We handle interconnection applications, identify applicable demand response programs and incentives, and manage enrollment and verification on your behalf.